Consolidated Edison Company of New York, Inc. | Evaluated Learning Experience
Intermediate Performance (FPE-0208)
80 hours (2 weeks).
June 1987 - July 2024.
Upon successful completion of the course, students will be able to measure temperature, pressure, fluid flow, and flue gas composition for performance testing.
Major topics include: introduction to steam and power plants; power plant operation and safety; pressure and pressure measurement; heat rate and plant cycle; flue gas analysis; test instruments; turbine testing; feedwater heater and deaerator testing; condenser testing; boiler testing; and air heater testing.
In the lower division baccalaureate/associate degree category, 2 semester hours in Electromechanical or Mechanical Engineering Technology (5/88) (5/93 revalidation) (5/98 revalidation) (1/04 revalidation) (8/13 revalidation) (8/18 revalidation).