Skip to main content

National College Credit Recommendation Service

Board of Regents  |  University of the State of New York

Consolidated Edison Company of New York, Inc. | Evaluated Learning Experience

Intermediate Performance (FPE-0208)

Formerly Intermediate Performance (PG-059-2)
Length: 

80 hours (2 weeks).

Location: 
Power Generation Services Training Center, 910 East 134th St., Bronx, NY (through December 1992); The Learning Center, 43-82 Vernon Boulevard, Long Island City, NY (beginning January 1993) and other company locations in the New York Metropolitan area.
Dates: 

June 1987 - Present.

Instructional delivery format: 
Traditional classroom model
Learner Outcomes: 

Upon successful completion of the course, students will be able to measure temperature, pressure, fluid flow, and flue gas composition for performance testing.

Instruction: 

Major topics include: introduction to steam and power plants; power plant operation and safety; pressure and pressure measurement; heat rate and plant cycle; flue gas analysis; test instruments; turbine testing; feedwater heater and deaerator testing; condenser testing; boiler testing; and air heater testing.

Credit recommendation: 

In the lower division baccalaureate/associate degree category, 2 semester hours in Electromechanical or Mechanical Engineering Technology (5/88) (5/93 revalidation) (5/98 revalidation) (1/04 revalidation) (8/13 revalidation) (8/18 revalidation).

Top